In design 2026–2027
Sherabad substation — QUMTEX INVEST 35 kV switchyard line
Construction of a 35 kV overhead line from the Sherabad substation to the 35 kV outdoor switchyard of the QUMTEX INVEST factory in Surkhandarya Region.
- Region
- Surkhandarya Region
- Status
- In design 2026–2027
- Voltage
- 35 kV
- Client
- REN JSC, Surkhandarya branch