2025–2026 project

Iyk Ota 110/35/10 kV substation and 110 kV cable line

Construction of a new substation in Tashkent: design, equipment supply, construction, installation and commissioning, handover into operation. Construction of a 110 kV cable line.

Region
Tashkent City
Status
2025–2026 project
Capacity
80 MVA, 2 × 40
Voltage
110/35/10 kV
Client
NEGU JSC
Contract
EPC
Iyk Ota 110/35/10 kV substation and 110 kV cable line on a 3D map of Uzbekistan

Scope of work

  1. Design
  2. Equipment supply
  3. Construction and installation
  4. 110 kV cable line
  5. Commissioning
  6. Handover into operation

Photos and video from the site

Iyk Ota substation in Tashkent, aerial view
Power transformer at the Iyk Ota substation
110 kV outdoor switchgear equipment
Protection and automation panel