Power line construction up to 500 kV: overhead and cable lines

Foundations, tower erection, conductor, earth wire and OPGW, cable lines and substation connections. Our portfolio covers 35 to 500 kV lines across Uzbekistan.

Power line construction up to 500 kV: overhead and cable lines on a 3D map of UzbekistanPower lines up to 500 kV
236.6kmof 110–220 kV lines built before 2025
40kmNurabad — Khalqa 500 kV double-circuit line
134kmof 220 kV lines in the 2026–2027 portfolio

Power lines up to 500 kV

Before 2025 GRIDCON built 236.6 km of 110–220 kV lines for NEGU JSC in the Kashkadarya, Namangan, Samarkand, Navoi and Syrdarya regions. The highest-voltage line in the portfolio is the 40 km double-circuit Nurabad — Khalqa 500 kV overhead line for ACWA Power in the Samarkand and Jizzakh regions.

For 2026–2027, 134 km of 220 kV lines are in design in the Fergana Valley under a World Bank project (REMIT). We build cable lines in dense urban areas: the 110 kV cable line of the Iyk Ota substation and the 53 km Sagbon — Tashmi 35 kV cable line in Tashkent.

Scope of work

  1. Route and line design, approvals
  2. Tower foundations
  3. Tower assembly and erection
  4. Stringing of conductor, earth wire and OPGW
  5. 35–110 kV cable lines
  6. Line in-out connections to substations
  7. Testing, commissioning and handover