Completed before 2025

Turakurgan TPP — Yulduz substation 220 kV line

Construction of a 26 km 220 kV overhead line from the Turakurgan thermal power plant to the Yulduz substation.

Region
Namangan Region
Status
Completed before 2025
Length
26 km
Voltage
220 kV
Client
NEGU JSC
Turakurgan TPP — Yulduz substation 220 kV line on a 3D map of Uzbekistan